2010年P(guān)MP美國項(xiàng)目管理考試習(xí)題及答案15
QUEST The Utility Theory _____ . 
A considers risk propensity of the decision maker. 
B attempts to formalize management's risk considerations. 
C works well with decision tree analysis. 
D is considered highly theoretical. 
E All of the above. 
參考答案:B
QUEST The Quality Risk _____ . 
A is minimized through continuous monitoring. 
B is considered a long term risk. 
C will be reflected in the in-service life of the project result. 
D B and C 
E All of the above. 
參考答案:E
QUEST Using the figure in the Special Window, what is the probability of success for Project B? 
A 0.3 
B 0.2 
C 0.35 
D 0.15 
E 0.12 
參考答案:C
QUEST Using the diagram in the Special window, what is the probability that Alternative I will be adopted and completed below budget: 
A 1.4 
B 0.8 
C 0.2 
D 0.12 
E None of the above 
參考答案:D

QUEST Using the possible loss outcomes shown in the Special window, find the expected  (loss) 
A ¥0 
B ¥-1,300 
C ¥-2,000 
D ¥-3,000 
E None of the above 
參考答案:B
相關(guān)試題:
2010年P(guān)MP美國項(xiàng)目管理考試習(xí)題及答案14
試題推薦:
2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選1
2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選2
2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選3
本站推薦
- 1高速公路項(xiàng)目部2010年度業(yè)務(wù)代表述職報(bào)告
- 2廣西六欽高速某標(biāo)段2010年度施工進(jìn)度計(jì)劃
- 3貴新高速公路粗苯泄漏的應(yīng)急監(jiān)測
- 4交通部試驗(yàn)檢測師:交通安全設(shè)施測試題(2010年度)
- 5交通部試驗(yàn)檢測工程師:橋涵工程試驗(yàn)檢測試題(2010年度)
- 62010年公路工程試驗(yàn)檢測師考試復(fù)習(xí)資料
- 7交通部試驗(yàn)檢測師:公路、材料測試題(2010年度)
- 82010年一級建造師考試模擬題及復(fù)習(xí)大綱
- 92010年全國一級建造師執(zhí)業(yè)資格考試模擬試題(含答案)


 
             
            .jpg) 
             
             
             
             
             
                     
                     
                     
                     
                     
                    