PMP認(rèn)證考試練習(xí)題及參考答案(三十九)
1 The Japanese Quality Control (QC) Circle movement motivated its participants in many ways. Which of the following represents the most important motivation for the QC circle participants? 
A improving the performance of the company 
B self-improvement 
C financial incentives 
D recognition among co-workers 
E strengthening of relationships between co-workers 
ans:A 
2 The Pareto Principle is a technique used by quality managers to determine which quality control problems of a particular service or manufacturing process should be corrected. Which of the following statements represents the philosophy of the principle? 
A In order to minimize financial losses from quality control problems, all problems which have a measurable cost associated with them should be corrected. 
B the majority of defects are caused by a small percentage of the identifiable problems. Improvements efforts should be reserved for these vital few problems. 
C in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected. 
D generally, 80 % of the quality control problems are justifiable for correction via cost-benefit analysis. The remaining 20% are not financially worthy of improvement efforts. 
E A and D 來源:考試大
ans:B 
3 A process characteristic has a true mean of 150 and a true standard deviation of 20. A sample of 25 items is taken from this process. The standard error of the estimate is: 
A 0.2 
B 0.8 
C 4 
D 5 
E 7.5 
ans:C 
4 Quality attributes 
A are used to determine how effectively the organization accomplishes its goals 
B can be objective or subjective in nature 
C are specific quality characteristics for which a product is designed, built, and tested. 
D A and B. 
E B and C 
ans:E 
5 A proven effective means to insure quality conformance is to: 
A delegate accountability to subordinates 
B revise quality specifications to match quality measurements 
C train workers in proper quality methods 
D inspect quality into the product 來源:www.examda.com
E make quality a higher priority than cost or schedule 
ans:C 
6 What is the relative priority of project Cost, Schedule and Quality? 
A 1)Cost - 2)Schedule - 3)Quality 
B 1)Quality - 2)Schedule - 3)Cost 
C 1)Quality - 2)Cost - 3)Schedule 
D 1)Schedule - 2)Quality - 3)Cost 
E All are of equal priority 
ans:E 
7 The quality objectives are approved in the conceptual stage of the project by the: 
A Project Engineer 
B Project Manager 
C Functional Manager 
D Quality Assurance Manager 
E Project Owner 
ans:E 
8 Of the following, who has the ultimate responsibility for meeting project quality objectives? 
A Project Engineer 
B Project Manager 
C Functional Manager 
D Quality Assurance Manager 
E Project Owner 來源:www.examda.com
ans:B 
9 Utility Theory: 
A considers the risk propensity of the decision makers. 
B is based on proven statistical methods. 
C deals with the usefulness of the end product. 
D is a key element of ISO 9000 
E B and C 
ans:A 
10 The Risk of NOT meeting project quality objectives: 
A can be minimized through continuous monitoring. 
B considered a long term risk. 
C will be reflected in the "in-service" life of the product or service. 
D B and C 
E All of the above. 
ans:E 
11 The "zero defect" concept was proposed by: 
A Deming 
B Juran 
C Crosby 
D Tagushi 
E A and D only 
ans:C 
12 The use of quality circles: 
A has proven ineffective in both Japan and the U.S. 
B is particularly effective in overcoming labor/management conflicts. 
C provides a quick fix for most quality problems. 
D allows workers the opportunity to generate solutions for chronic quality problems. 
E A and B only 
ans:D 
本站推薦
- 1PMP項目管理進度系統(tǒng),能否讓您的項目一馬當(dāng)先?答案當(dāng)然是肯定的!
- 2項目進度管理有難題?PMP系統(tǒng):一問就知,輕松解決
- 3PMP項目管理,項目進度管理的疑問終結(jié)者,您還在等什么?
- 4項目進度難掌控?PMP管理系統(tǒng):疑問解答,效率倍增!
- 5PMP項目管理進度系統(tǒng),能否讓您的項目效率翻倍?答案就在這里!
- 6項目進度滯后?PMP管理系統(tǒng):一問就知道怎么加速!
- 7項目管理不再迷茫,PMP進度系統(tǒng):您的疑問我來答
- 8PMP在手,項目進度管理難題還用問嗎?輕松搞定
- 9還在為項目進度頭疼?PMP管理系統(tǒng)幫您一問解千愁!


 
             
             
             
             
             
             
             
                     
                     
                     
                     
                     
                     
                    