PMP認(rèn)證考試練習(xí)題及參考答案(二十九)
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
1 Which of the following impacts the critical path? 
A Changing the task duration. 
B Reduce the free float of an activity. 
C Executing a backward pass 
D A or B 
E None of the above. 
ans:A 
2 The range of time allowed for an activity to be completed in is the _____. 
A Planned time (Duration). 
B Float time (LS - ES, or LF - EF). 
C Critical time (when ES = LS, or EF = LF). 來(lái)源:www.examda.com
D Scheduled time (LF - ES). 
E Event. 
ans:D 
3 Free float is the amount of time that an activity may be delayed with out affecting the _____. 
A Early start of the succeeding activities. 
B Late start of the succeeding activities. 
C Project finish. 
D Cost of the project. 
E None of the above. 
ans:A 
4 Using the problem stated in the Special window, Calculate the deviation of duration for the task, using the PERT concept of standard deviation of task duration. 
A 0.5 
B 1 
C 1.8 
D 2.2 
E 2.8 
ans:C 
5 In crashing a task, you would focus on: 
A As many tasks as possible. 
B Non critical tasks. http://ks.examda.com
C Accelerating performance of tasks on critical path. 
D Accelerate performance by minimizing cost. 
E A and D. 
ans:C 
6 Using the problem stated in the Special window, Calculate the expected value of duration (in days) using the PERT concept of the expected duration of a task 
A 8 
B 8.8 
C 9.1 
D 9.7 
E 10.5 
ans:B 
7 Using the WBS in the Special window, an instance of a work package is: 
A Build house 
B Excavate 
C Prepare Foundation 
D B and C 
E None of the above 來(lái)源:考試大網(wǎng)
ans:E 
8 All of the following are categories of a milestone in a schedule except: 
A End date. 
B Contract dates. 
C Key events scheduled. 
D Imposed dates. 
E Task duration. 
ans:E 
9 The actual configuration of a PERT/CPM network _____ the amount of resources that can be devoted to the project. 
A Increases. 
B Is not affected by 
C Does not require 
D Is heavily dependent upon 
E Is the only means of determining 
ans:D 
10 Excessive flexibility in specifying requirements will _____ the likelihood of time overruns. 
A Reduce. 
B Eliminate. 
C Double 
D Increase 
E Not affect 
ans:D 
11 The key purpose of project control is to: 
A Plan ahead for uncertainties. 
B Generate status reports. 
C Keep the project on track. 
D Develop the project road map. 
E All of the above. 來(lái)源:考試大網(wǎng)
ans:C 
12 Fast tracking means to: 
A Speed up a project through parallel tasks. 
B Swap one task for another. 
C Reduce the number of tasks if possible. 
D B and C. 
E None of the above. 
ans:A 
本站推薦
- 1PMP項(xiàng)目管理進(jìn)度系統(tǒng),能否讓您的項(xiàng)目一馬當(dāng)先?答案當(dāng)然是肯定的!
- 2項(xiàng)目進(jìn)度管理有難題?PMP系統(tǒng):一問(wèn)就知,輕松解決
- 3PMP項(xiàng)目管理,項(xiàng)目進(jìn)度管理的疑問(wèn)終結(jié)者,您還在等什么?
- 4項(xiàng)目進(jìn)度難掌控?PMP管理系統(tǒng):疑問(wèn)解答,效率倍增!
- 5PMP項(xiàng)目管理進(jìn)度系統(tǒng),能否讓您的項(xiàng)目效率翻倍?答案就在這里!
- 6項(xiàng)目進(jìn)度滯后?PMP管理系統(tǒng):一問(wèn)就知道怎么加速!
- 7項(xiàng)目管理不再迷茫,PMP進(jìn)度系統(tǒng):您的疑問(wèn)我來(lái)答
- 8PMP在手,項(xiàng)目進(jìn)度管理難題還用問(wèn)嗎?輕松搞定
- 9還在為項(xiàng)目進(jìn)度頭疼?PMP管理系統(tǒng)幫您一問(wèn)解千愁!


 
             
             
             
             
             
             
             
                     
                     
                     
                     
                    